13 - 02 - 26
Tower Crane Installed on Site
A striking new addition has appeared on the Glen Waverley skyline, with the tower crane now installed and in operation on site.
This is a milestone moment in any construction project, the crane becomes the workhorse of the build, lifting materials, formwork and equipment into place as the building begins to rise. Its arrival is also a visible sign of progress for the local community, marking the shift from groundworks into vertical construction.
With the crane now operational, the team is well positioned to move efficiently through the coming stages of construction. We’ll continue to share updates as Luna Residences grows level by level, so keep an eye out, because it won’t be long before you can spot it on the skyline.


