15 - 06 - 26
Level 3 Slab Pour Set to Commence
Progress at Luna Residences continues to climb, with the structure now up to level 3 and the slab pour ready to commence.
The formwork and reinforcement for this level are now complete, with the tower crane playing a key role in lifting materials into place as the site team prepares for the pour. Each level built adds to the momentum of the project, and it’s great to see the building rising steadily above the surrounding streetscape.
With level 3 underway, the team is well on track and continuing to build at a strong pace. We look forward to sharing the next update as construction moves through to the following levels.